How GNEE Shell and Tube Heat Exchangers Are Made? | Full Factory Production Process

Other Videos
December 10, 2025
Category Connection: Shell Tube Heat Exchanger
Brief: Need quick answers about practical use? This video highlights the essentials. Join us for a full factory walkthrough to see how GNEE's 0.375" Water Tube Heat Exchangers are manufactured. You'll learn about the production process, from material selection to final assembly, and discover the robust construction that ensures reliability in heating water applications.
Related Product Features:
  • Constructed with a stainless steel shell and tube design for efficient heat transfer in water heating.
  • Features a simple and reliable structure suitable for high temperature and high-pressure conditions.
  • Available in a wide range of sizes from 3/8 inch up to 120 inches to fit various application needs.
  • Surface is treated with anti-rust oil to enhance durability and corrosion resistance.
  • Manufactured using high-pressure die casting and machining processes for precision and strength.
  • Comes with an ISO9001 certificate, ensuring quality management standards are met.
  • Designed for easy maintenance with space for tube bundle extraction and replacement.
  • Finished in a standard silver color and tested hydraulically at 1.5 times the working pressure.
Faqs:
  • What are the key applications for this shell and tube heat exchanger?
    This heat exchanger is primarily designed for heating water in various pipe fitting applications, utilizing its efficient heat transfer capabilities in industrial settings.
  • How is the quality and reliability of the heat exchanger ensured?
    The heat exchanger undergoes rigorous hydraulic testing at 1.5 times the working pressure and is certified with ISO9001, ensuring it meets high standards for safety and performance in demanding conditions.
  • What installation considerations should be taken into account for this product?
    Ensure there is adequate space at the front for tube bundle extraction, with a clear width of at least 0.8m for operation, and verify that valves and instruments are positioned for easy access and observation during use.
Related Videos